CSCI 350 - Software Engineering
Spring 2009
Assignments
Submission instructions using Sauron
- Requirements, drafts due 1/20 at 1:15 pm;
final copy due 1/22 at 1:15 pm.
- Black boxes, drafts due 1/27 at 1:15 pm; final version
due 2/3,2/4 at 1:15 pm.
- Team Requirements, due 2/5 at 1:15 pm.
- Initial Design, due 2/10 at 1:15 pm.
- Increment 1 Implementation,
code freeze at 1:00 pm on 2/24, documentation due 1:15 pm on 2/26.
- Increment 2 Requirements/Design,
presentations on 3/3 and 3/5; documentation due 1:15 pm on 3/5.
- Increment 2 Implementation,
code freeze at 1:15 pm on 3/31, documentation due 1:15 pm on 4/2.
- Increment 3 Requirements/Design,
presentation on 4/9, documentation due 1:15 pm on 4/14.
- Increment 3 Implementation,
code freeze at 1:15 pm on 4/21, documentation due 1:15 pm on 4/23.